psl195 (b) Each individual submerged valve Situated offshore or in inland navigable waters has to be marked, or Situated by standard study tactics, to facilitate fast location when Procedure with the valve is needed.

Operators of transportation pipelines around the Outer Continental Shelf must establish on all their respective pipelines the particular details at which functioning accountability transfers to some producing operator. For all those instances where the transfer points are not identifiable by a long lasting marking, Each individual operator could have till September fifteen, 1998 to determine the transfer factors. If it is not practicable to durably mark a transfer position and also the transfer place is located higher than water, the operator ought to depict the transfer stage on the schematic managed close to the transfer stage.

Operators may perhaps elect to work with other systems In case the operator can demonstrate the technological innovation can offer an equivalent knowledge of the condition of the line pipe for danger becoming assessed.

(b) An arc burn may very well be repaired by wholly taking away the notch by grinding, When the grinding will not decrease the remaining wall thickness to fewer than the bare minimum thickness demanded through the tolerances during the specification to which the pipe is manufactured.

If any sign of SCC is uncovered in a section, an operator ought to mitigate the menace in accordance with one of the following applicable approaches:

Upon request, operators will have to submit their treatments to PHMSA or, in the case of an intrastate pipeline facility controlled by a State, to the suitable Condition company.

(b) No operator may perhaps allow the tension inside of a pipeline throughout surges or other variations from regular functions to exceed one hundred ten % in the working stress Restrict recognized underneath paragraph (a) of this segment.

signifies a tool or automobile that makes use of a non-destructive tests approach to inspect the pipeline from the inside. Also called intelligent

signifies piping or machines used in the production, extraction, recovery, lifting, stabilization, separation or managing of petroleum or carbon dioxide, or related storage or measurement. (To get a generation facility under this definition, piping or products should be Utilized in the entire process of extracting petroleum or carbon dioxide from the bottom or from services the place CO2 is developed, and planning it for transportation by pipeline.

(a) Except as provided in paragraph (b) of the part, Every single operator shall, at intervals not exceeding 15 months, but at the very least as soon as Each individual calendar 12 months, or in the case of pipelines used to hold hugely volatile liquids, at intervals never to exceed seventy one⁄2 months, but not less than 2 times Each and every calendar year, inspect and exam Just about every stress restricting product, relief valve, force regulator, or other merchandise of pressure Regulate products to determine that it's functioning thoroughly, is in very good mechanical condition, which is sufficient within the standpoint of capability and trustworthiness of operation for that support wherein it is utilised.

Discovery of a ailment happens when an operator has adequate facts to determine that a ailment presenting a potential danger for the integrity of your pipeline exists. An operator need to instantly, but no later on than a hundred and eighty days immediately after an assessment, receive sufficient information regarding a condition to generate that willpower, Except the operator can exhibit the a hundred and eighty-day interval is impracticable.

You have to reevaluate your unprotected buried or submerged pipe and cathodically guard the pipe in locations where Lively corrosion is identified, as follows:

Besides the requirements and proposals of NACE SP0204, Segment four, the plan's techniques for oblique inspection should include things like provisions for conducting a minimum of two unique, but complementary, oblique assessment electrical surveys, and The idea to the picks as probably the most suitable for the pipeline phase according to the info gathering and integration stage.

(b) A pipeline that qualifies to be used under this segment need not adjust to the corrosion Command specifications of subpart H of this aspect right until 12 months right after it truly is put into service, notwithstanding any prior deadlines for compliance.